Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 4-157.  AIR TANKS - Continued b. Installation. (1)   Coat all pipe threads with pipe sealant (Item 2, Appendix E) and install valves and fittings as noted during removal procedure. (2)   Slide air tank into position.  Be sure air tank draincock is at the lowest point. (3)   Install clamps (3) on frame and secure with capscrews (2) and nuts (4). (4)   Install capscrews (1), washers (5), and nuts (6).  Tighten securely. (5)   Coat all pipe threads with pipe sealant (Item 2, Appendix E) and install air lines. c. Follow-on Maintenance. (1)   Connect batteries (see para 4-114). (2)   Check for leaks as described in para 4-147 . 4-434

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business