Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ROOF BEACON LIGHT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 4-85.  ROOF BEACON LIGHT This task covers: a. Removal d.  Assembly b. Disassembly e.  Installation c. Cleaning and Inspection   f    Follow-on Maintenance TOOLS REQUIRED EQUIPMENT CONDITION Tool Kit, General Mechanics, Automotive Main Engine Shutdown (see para 2-12.) (Appendix B, Section IIl, Item 1) APU Shutdown (see para 2-16.) Batteries Disconnected (see para 4-114.) MATERIALS/PARTS REQUIRED Emery Cloth (Item 25, Appendix E) Butt Splice (Item 27, Appendix E) a. Removal. (1)   Open clip and remove ring (1). (2)   Remove dome (2). (3)   Remove three nuts (3) and lift light assembly for access to connecting wires. (4)   Tag and disconnect wires. (5)   Remove light assembly. b. Disassembly. (1)   Open clip (4). (2)   Remove and replace lamp (5). 4-322

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business