TM 5-4210-233-14&P-1
4-74. AIR BOTTLE RACK AND SLIDE TRAY
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-2 .)
(Appendix B, Section lIl, Item 1) APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
a.
Removal.
(1) Remove two screws (1), two flatwashers
(2), two lockwashers (3) and two nuts (4)
from bottle box (5).
(2) Remove bottle box (5).
(3) Remove the six screws (6), twelve flat
washers (7), six lockwashers (8) and six
hex nuts (9).
(4) Remove slide tray (10) and rails (11).
(5) Remove six screws (12), flatwashers
(13), lockwashers (14), six hex nuts (15),
and slide tray (10) from rails (11).
b.
Installation.
(1) Secure rails (11) to compartment floor
with six screws (6), twelve flatwashers
(7), six lockwashers (8) and hex nuts (9).
NOTE
Do not install the center screw on each side at this
time. The bottle box must be in position when
these screws are installed.
(2) Secure slide tray (10) to rails (11) with
six screws (12), flatwashers (13),
lockwashers (14), and hex nuts (15).
(3) Secure bottle box (5) to slide tray (10)
with two screws (1), two flat washers (2),
two lockwashers (3) and two hex nuts (4).
c.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114 .)
4-303
|