Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FOAM TANK DRAIN VALVE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 4-55.  FOAM TANK DRAIN VALVE This task covers: a. Removal d. Assembly b. Disassembly e. Installation c. Cleaning and Inspection f. Follow-on Maintenance TOOLS REQUIRED: EQUIPMENT CONDITION Tool Kit, General Mechanics, Automotive Main Engine Shutdown (see para 2-12 .) (Appendix B, Section IlI, Item 1) APU Shutdown (see para 2-16 .) Batteries Disconnected (see para 4-114 .) Foam Tank Drained (see para 2-17 .) MATERIALS/PARTS REQUIRED Curb Side Operator's Panel Removed Dry Cleaning Solvent (Item 3, Appendix E) (see para 4-26 .) Repair Kit (Figure 13, Appendix F) Grease Silicone (Item 11, Appendix E) a. Removal. (1) Remove four bolts (1). (2) Remove valve (2) from brackets (3). (3) Remove four bolts (4) and valve (2) from flanges (6). (4) Remove and discard two flange O-rings (5). 4-269

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business