Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: GAUGES-CROSSLAY, DISCHARGE, PUMP PRESSURE AND VACUUM
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233- 14&P-1 4-17.  GAUGES-CROSSLAY, DISCHARGE, PUMP PRESSURE AND VACUUM This task covers: a. Removal c. Follow-on Maintenance b. Installation TOOLS REQUIRED: EQUIPMENT CONDITION Tool Kit, General Mechanics, Automotive Main Engine Shutdown (see para 2-12 .) (Appendix B, Section lll, Item 1) APU Shutdown (see para 2-16 .) Batteries Disconnected (see para 4-114 .) a. Removal. (1)   Open panel access door at top of pump operators panel. (2)   Close   valve   (1)   connected   to   gauge   (2)      by turning knurled knob (3) fully clockwise. (3)   Disconnect tube (4) from valve (1). (4)   Remove    two    nuts    (5),    lockwashers    (6)    and bracket(s)  (7)  or  (8)  and  remove  gauge  (2)  with valve (1) attached. (5)   Remove valve (1) from gauge (2). b. Installation. (1)   Install valve (1) on new gauge (2). (2)   Install gauge (2) with valve (1) attached.  Secure gauge   with   two   nuts   (5),   lockwashers   (6)   and bracket(s) (7) or (8). (3)   Open  valve  (1)  by  turning  knurled  knob  (3)  fully counter-clockwise. (4)   Check valves under operating conditions. (5)   Close pump panel access door. c. Follow-on Maintenance. (1)   Connect batteries (see para 4-114). 4-169

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business