| |
TM 5-4210-233-14&P-1
5-71. APU CRANKSHAFT, BEARINGS AND SEALS
This task covers:
a.
Removal
c.
Installation
b.
Cleaning and Inspection
d.
Follow-on Maintenance
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
APU Removed (see para 4-207.)
(Appendix B, Section III, Item 1)
APU Flywheel Removed (see para 5-67.)
APU Gear Cover Removed (see para 5-68.)
Shop Equipment, Automotive
APU Governor Cup Removed (see para 5-69.)
Maintenance and Repair
APU Camshaft Removed (see para 5-70.)
(Appendix B, Section III, Item 4)
APU Cylinder Head Removed (see para 5-72.)
MATERIALS/PARTS REQUIRED
Gasket (Figure 203, Appendix F)
a.
Removal.
(1) Remove lock ring (1) and retaining washer (2).
(2) Pull off crankshaft gear (3) using gear puller.
5-379
|