Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
5-76. APU ENGINE OIL PUMP AND OIL BASE - Continued
e. Installation
(1)
Install new oil pump gasket (11), oil pump (10), two lockwashers (9), and two capscrews (8).
(2)
Torque two capscrews (8) to 15-20 ft Ibs (21-27 N.m).
(3) Install retainer washer (7) and snap ring (6).
(4)
Install oil intake cup (5).
(5)
Install new oil base gasket (4), oil base (3), six lockwashers (2), and six capscrews (1).
(6)
Torque six capscrews (1) alternately to 32 to 38 ft lbs (44 to 51 N.m).
f.
Follow-on Maintenance.
(1)
Install gear cover (see para 5-68).
(2)
Install flywheel (see para 5-67).
(3)
Install APU (see para 4-207).
5-399

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business