Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
5-25. WATER PUMP - Continued
(10) Install hose (6) between oil cooler pipe and water pump housing (3). Tighten hose clamps
securely.
(11) Install hose (4) between radiator pipe, and water pump housing (3). Tighten hose clamps
securely.
(12) Install hose (1) between thermostat cover and water pump housing (3). Tighten hose clamps
securely.
(13) Install fuel line bracket (12) with two bolts (11). Replace tie straps as necessary.
g. Follow-on Maintenance.
(1)
Connect batteries (see para 4-114).
(2)
Refill radiator (see para 3-6), start main engine and check for leaks. Tighten/remake connections
as required.
(3)
Stop engine after 2 minutes and top up radiator again.
(4)
Restart engine and allow it to reach full working temperature. Watch for leaks as pressure builds.
Stop engine if leak is detected and repair.
(5)
When engine has run at full operating temperature for 5 minutes shutdown and allow to cool.
Recheck radiator level.
5-173

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business