|
|
TM 5-4210-233-14&P-1
5-22.
BLOWER REPAIR - Continued
NOTE
Remove shop cloth before timing rotors and setting clearances.
(36)
Install four screws each (27) and washers (28) in front end plate (6) and rear end plate (10).
(37)
Tighten screws (27) to 15 Ib-ft (20 N ).
m
NOTE
Correct rotor operating range is 0.004 to 0.006 in (0.102 to
0.152 mm). If rotor does not meet specification, do
steps (42) through (45).
Clearances between rotor lobes must be measured 1 in.
(25.4 mm) from end plate.
5-136
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |