|
|
TM 5-4210-233-14&P-1
5-19. TACHOMETER DRIVE
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
Engine cover open
a. Removal
(1) Loosen jamnut (1).
(2) Loosen screw (2) and r move clamp (3).
e
(3) Remove tachometer drive housing (4) and gasket (5).
(4) Remove tachometer drive (6).
5-109
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |