Click here to make tpub.com your Home Page

Page Title: Testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
5-14. STARTER REPAIR AND TESTING- Continued
c.
Testing.
NOTE
Start testing with brush holder located directly over ground
terminal.
(1)
Test brush holders (1, 2, and 3) one at
a time. Place red (+) lead on ground
terminal (4) and black (-) lead on
ground terminal (4) and black (-) lead
on each brush holder. Multimeter
needle must move.
(2)
Test brush holders (5, 6, and 7) one at
a time. Place red (+) lead on ground
terminal (4) and black (-) lead on each
brush holder. Multimeter needle must
not move.
(3)
Test armature (8). Place red (+) lead
on end of shaft (9). Place black (-)
lead on each metal strip (10) around
large part of armature. Multimeter
needle must move to zero.
(4)
Place red (+) lead on end of shaft (9).
Place black (-) lead on each
commutator strip (11). Multimeter
needle must not move.
5-76

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business