Click here to make tpub.com your Home Page

Page Title: Installation-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
5-11. ENGINE ASSEMBLY - Continued
(22) Connect wires to ground terminal (25) and BAT terminal (26) of starter motor.
(23) At left rear of engine, install two wires (27) on oil pressure sending unit. Connect wire (28) to hour
meter sending unit.
(24) Connect positive (29) and negative (30)
cables
(25) Connect two-wire plug (31) to top of
(26) Install new butt splice connectors on wires 1095L
and 1096L for Jacobs engine brake which enter
inside of each cylinder head near rear of blower.
They connect to engine wiring harness on driver's
side of engine.
5-57

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business