Click here to make tpub.com your Home Page

Page Title: MONITOR AND NOZZLE CONTROLS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-203. MONITOR AND NOZZLE CONTROLS
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
a. Removal
(1) Remove four screws (1) and cover (2).
(2) Tag and disconnect wires from switch to be replaced.
(3) Remove hex nut with boot (3), lockwasher (4) and switch (5).
b. Installation.
(1) Put switch (5) in position and install lockwasher (4) and hex nut with boot (3).
(2) Connect wires to switch (5) and remove tags.
(3) Install cover (2) with four screws (1).
c. Follow-on Maintenance.
(1) Connect batteries (see para 4-11 ).
(2) Test operation of switch.
4-511

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business