|
|
TM 5-4210-233-14&P-1
4-199. AIR OPERATED AERIAL DISCHARGE VALVE
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
TOOLS REQUIRED
PERSONNEL REQUIRED: 2
Tool Kit, General Mechanics, Automotive
(Appendix B, Section III, Item 1)
EQUIPMENT CONDITION
Main Engine Shutdown (see para 2-12 .)
MATERIALS/PARTS REQUIRED
APU Shutdown (see para 2-16 .)
Dry Cleaning Solvent (Item 3, Appendix E)
Batteries Disconnected (see para 4-114 .)
Gaskets (Figure 23, Appendix F)
Drain Aerial Waterway (see para 2-17 .)
Gaskets (Figure 25, Appendix F)
a. Removal
(1) Remove four nuts (1) and washers (2). Remove actuator (3) from valve (4).
(2) Remove two nuts (5), two bolts (6) and two clamps
(7). Slide seal (8) onto pipe (9).
(3) Remove eight nuts (10), lockwashers (10A) and
eight bolts (11). Remove elbow (12), gaskets (13)
and valve (4). Discard gaskets.
b. Disassembly.
(1) Remove four screws (14), four lockwashers
(15), cover (16), gasket (17) and thrust washer
(18). Discard gasket.
4-499
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |