|
|
TM 5-4210-233-14&P-1
4-173. LADDER TREADS
THIS TASK COVERS:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
a.
Removal.
(1) Remove 2 screws (1).
(2) Remove fastener (2).
(3) Remove treads (3).
b.
Installation.
(1) Install new treads (3).
(2) Install fastener (2).
(3) Install and tighten two screws (1).
c.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
4-458
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |