Click here to make tpub.com your Home Page

Page Title: QUICK RELEASE VALVES (QR-1)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-150. QUICK RELEASE VALVES (QR-1)
THIS TASK COVERS:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section lll, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
All Air Tanks Drained (see para 4-157 .)
a. Removal.
NOTE
There are three quick release valves in the brake system. One is
located in-line on the passenger side above the differential of the
forward tandem axle. Another is located in-line on the driver's
side above the differential of the rear tandem axle. The third is
mounted in the center of the first frame crossmem- ber ahead of
the front axle.
NOTE
Refer to locator view in para 4-147 and air schematics in
Appendix G for additional information.
(1) Tag and disconnect air lines from quick release valve.
(2) Remove two mounting bolts and remove valve.
b. Installation.
(1) Mount quick release valve with exhaust port pointing down.
(2) Install mounting bolts.
(3) Reconnect air lines as identified during removal.
c
Follow-on Maintenance.
(1) Connect batteries
(2) Check for leakage as
described in para 4-147).
4-425

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business