Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&p-1
4-141. RADIATOR HOSES AND PIPING - Continued
(4) Install hoses (1 through 5) as necessary. Secure with damps (6).
(5) After installation always ensure there is at least 1 in. (25 mm) clearance between any hose or pipe
and any moving part (eg: fan belt). Replace any plastic tie straps (Item 33, Appendix E) removed in
Step (2).
(6) Fill radiator with coolant (Item 29, Appendix E). Make sure all drain cocks are closed.
(7) Install radiator cap and start engine. Check for leaks as engine warms up.
(8) Stop main engine, and when co l, check radiator level. Add coolant as required.
o
b. Follow-on Maintenance.
(1) Install engine compartment covers (see para 4-127).
(2) Connect batteries (see para 4-114).
4-411

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business