|
|
TM 5-4210-233-14&P-1
4-123. AC AMMETERS AND VOLTMETERS - Continued
b
Installation.
(1) Install meter (8) to plate (2) with three lockwashers (7) and nuts (6).
(2) Install wiring harness to meter (8) with lockwasher (5) and nuts (4).
(3) Install plate (2) to box (3) with four screws (1).
c.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
(2) Start APU and check operation of meters (see para 2-16).
4-380
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |