Click here to make tpub.com your Home Page

Page Title: Cleaning and Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-115. BATTERY BOX ASSEMBLY - Continued
b. Cleaning and Inspection.
(1) Clean box with water and baking soda (Item 5, Appendix E) solution.
(2) Inspect box doors for cracks. If cracked, replace.
(3) Inspect box panels for corrosion. Clean corrosion with emery cloth (Item 25, Appendix E). If corrosion
cannot be removed, replace battery box components as necessary.
c.
Assembly.
(1) Install clip(18), and fasten in place with three screws (15), washers (16), and nuts (17).
(2) Install latch (14), and fasten in place with three screws (11), washers (12), and nuts (13).
(3) Align hinge (9) on panels (5 and 10) and install eight screws (6), washers (7), and nuts (8).
(4) Align hinge (4) on panel (5) and truck body and install eight screws (1), washers (2), and nuts (3).
d. Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
4-369

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business