|
|
TM 5-4210-233-14&P-1
4-102. HEATER CONTROL HEAD ASSEMBLY
This task covers:
a. Removal
c. Follow-on Maintenance
b Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
a. Removal.
(1) Remove two screws (1) and washers (2). Tilt plate (3) forward.
(2) Remove two screws (4), and two screws (5) with two flat washers (6), two lockwashers (7), and
two hex nuts (8).
4-347
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |