|
|
TM 5-4210-233-14&P-1
4-85. ROOF BEACON LIGHT
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f Follow-on Maintenance
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12)
(Appendix B, Section IIl, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Emery Cloth (Item 25, Appendix E)
Butt Splice (Item 27, Appendix E)
a. Removal.
(1) Open clip and remove ring (1).
(2) Remove dome (2).
(3) Remove three nuts (3) and lift light
assembly for access to connecting wires.
(4) Tag and disconnect wires.
(5) Remove light assembly.
b. Disassembly.
(1) Open clip (4).
(2) Remove and replace lamp (5).
4-322
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |