4-42. WATER VALVE
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
MATERIAL/PARTS REQUIRED:
EQUIPMENT CONDITION
Took Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
MATERIALS/PARTS REQUIRED
All Piping Drained (see para 2-17.)
Dry Cleaning Solvent (Item 3, Appendix E)
Curb Side Operators Panel Removed (see para
Grease, Silicone (Item 11, Appendix E)
4-26 .)
Cotter Pin (Figure 28, Appendix F)
Repair Kit (Figure 22, Appendix F)
a. Removal
(1) Remove cotter pin (1) and retaining pin (2).
Discard cotter pin.
(2) Remove control rod (3) and nylon washe (4).
r
(3) Remove eight bolts (5).
(4) Remove valve (6) from between flanges (7).
(5) Remove and discard two O-rings (8).
4-220
|