|
|
TM 5-4210-233-14&P-1
4-25. STREET SIDE OPERATOR'S PANEL- Continued
b. Installation.
(1) Place street side operator's panel on running board.
(2) Secure wires to throttle light (53) and remove tags.
(3) Secure wires to relief valve indicator lights (51 and 52) and remove tags.
(4) Install two 3/8 hoses (46) on cooler valve (47).
(5) Install two hoses (43) on top of tees (44) at the test gauge panel.
(6) Install three 3/8 inch hoses (41) on pilot valve (42).
(7) Secure center of panel with two panhead screws (54), two flat washers (55), and two nuts (56).
(8) Secure panel with six pieces of panel trim (58) and thirty screws (57).
(9) Install metering valve drain hose (49).
(10) Install air supply hose (50).
(11) Install Y-strainer drain hose (48).
(12) Secure metering valve indicator ring (40) to panel with two screws (39).
(13) Secure metering valve handle (38) with two screws (37).
(14) Install RPM counter cable (35) in coupler (36).
(15) Install pump drain cable (34), washer (33), two nuts (31 and 32) and handle (30).
(16) Install manual pump shift cable (25), with washer (24), two nuts (22 and 23) and handle (21).
(17) Install nut (29) on rod (28) and install handle (27) with set screw (26).
(18) Install washer (20) and nut (19) on valve (18) and secure handle (17) with setscrew (16).
(19) Install primer control cable (15), washer (14), two nuts (13) and handle (12).
(20) Secure three drain valves (10) to panel with six screws (11).
(21) Install three plunger assemblies (9) in drain valves (10) and install snap rings (8).
(22) Secure front suction control wheel (5) and washer (6) with roll pin (4) on shaft (7).
(23) Install fourteen T-handles (2) on operating rods (3) and secure with fourteen roll pins (1).
(24) Replace any tie straps that were removed.
4-188
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |