Click here to make tpub.com your Home Page

Page Title: PUMP PANEL TOGGLE SWITCHES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-22. PUMP PANEL TOGGLE SWITCHES
This task covers:
a. Inspection
c. Follow-on Maintenance
b. Replacement
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para. 2-12.)
(Appendix B. Section III, Item 1)
APU Shutdown (see para. 2-16.)
Gauge Panel Removed (see para. 4-18.)
MATERIALS/PARTS REQUIRED
Batteries Disconnected (see para. 4-114.)
Tags (Item 32, Appendix E)
a. Removal.
(1 ) Tag wires and remove screws (3).
(2) Remove nut (1) and lock washer (2).
(3) Remove switch (4).
b. Installation.
(1 ) Connect wires to switch with screws (3).
(2) Secure switch to panel with nut (1) and lock
washer (2).
c.
Follow-on Maintenance.
(1) Install gauge panel (see para. 4- 8).
(2) Connect batteries (see para. 4-114).
(3) Test operation of switch.
4-179

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business