|
|
TM 5-4210-233-14&P-1
4-16. CROSSLAY HOSE BIN ROLLERS
This task covers:
a.
Removal
b.
Installation
TOOLS REQUIRED:
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section lll, Item 1)
APU Shutdown (see para 2-16 .)
a.
Removal.
(1) Remove from top of front roller: two acorn nuts (1) with attached rods (2) and flat washers (3).
Remove tubing (4) with attached plastic bearings (5).
(2) Remove rear and lower rollers by removing bolts (6), flatwashers (9), lockwashers (10), and nuts
(11), and two brackets (7). Remove tubing (4) and bearings (5) from rods (8).
b.
Installation.
(1) Install front tubing (4) with plastic bearings (5), and attach with rods (2), flat washers (3) and acorn
nuts (1).
(2) Assemble rear and lower tubing (4) and bearings (5) on rods (8).
(3) Install rollers in position.
(4) Install two brackets (7).
(5) Fasten brackets to truck with bolts (6), flatwashers (9) lockwashers (10), and nuts (11).
4-168
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |