| |
TM5-4210-229-14&P
4-45. FIRE BODY REPLACEMENT (Continued).
INSTALLATION
When lifting an object, make sure the hoist
and sling are fastened securely. Be sure
the item being lifted does not exceed the
capacity of the lifting device.
a.
Using a hoist and sling, carefully lower fire body
onto chassis.
b.
Secure fire body (5) to chassis using twelve bolts
(4), washers (3), lockwashers (2) and nuts (1).
c.
Connect chassis electrical system (paragraph
4-148).
d.
Install fire body electrical components (paragraph
4-46 thru 4-56).
e.
Install twin agent fireflghting system (paragraph
4-24).
f.
Install auxiliary firefighting equipment (paragraph
4-18 thru 4-22).
g.
Install accessories (paragraph 4-13 thru 4-16).
4-46. DECK LIGHT MAINTENANCE.
This task covers:
a.
Removal
b. Repair
c. Installation
INITIAL SET-UP
Tools
General Safety Instructions
General Mechanics Tool Kit
Battery Selector Switch OFF.
Battery Cables Disconnected.
Materials/Parts
Deck Light (AG-R-4413)
Bulb (4413)
REMOVAL
a.
Disconnect control wiring (1).
b.
Remove four locknuts (2) and screws (3) securing
deck light (4) to fire body.
c.
Remove deck light (4).
4-60
|