| |
TM5-4210-229-14&P
4-29. P-K-P AGENT TANK REPLACEMENT (Continued).
b. Remove four nuts (6), washers (7) and bolts (8).
When lifting an object, make sure the hoist
and sling are fastened securely. Be sure
the item being lifted does not exceed the
capacity of the lifting device.
c.
Using a hoist and sling attached to the tank (5),
carefully lift tank from mounting base (9).
INSTALLATION
When lifting an object, make sure the hoist
and sling are fastened securely. Be sure
the item being lifted does not exceed the
capacity of the lifting device.
a.
Using a hoist and sling attached to the tank (5),
carefully lift and position tank onto the mounting
base (9).
b.
Secure tank using four bolts (8), washers (7), and
nuts (6).
c.
Connect hoses (1 through 4) to tank (5).
d.
Pressurize the system (paragraph 2-25).
4-44
|