|
|
TM 5-4210-224-14&P
Section II. MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
INTERMEDIATEDEPOT TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
03
PUMP COMPARTMENT ASSEMBLY
(Continued)
CURBSIDE DOOR ASSEMBLY
Replace
.25
91
COMPARTMENT LIGHT
Replace
.25
91
Repair
.25
91
F
ROOF PANEL
Replace
.50
91
PUMP PANEL LIGHTS
Replace
.50
91
Replace
.25
91
F
ENGINE THROTTLE CONTROL ASSEMBLY Replace
1.0
91
TACHOMETER/HOURMETER
Replace
.50
91
Calibrate
.50
89
WATER TANK LEVEL GAUGE
Replace
.50
91
Replace
.25
85
SUCTION AND DISCHARGE STUB CAPS
GAUGES, CONTROL KNOBS, AND
Replace
3.0
91
SWITCHES
CALIBRATION AND TEST PORTS
Replace
1.0
91
STREETSIDE PUMP PANEL
Replace
.50
91
G
STEPS AND MOUNTING BRACKETS
Replace
1.0
91
PRIMING TANK AND TUBING
Service
.25
Replace
.50
91
FRONT PANEL
Replace
.50
91
B-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |