|
|
TM5-4210-224-14&P
4-205. TIRES REPLACEMENT. (Continued)
f.
A Single Wheel Installation
(1) Place the wheel and tire assembly in
position on the hub/rotor and install the
lug nuts, snugly, in a criss-cross pattern to
minimize runout.
NOTE
Be sure pins on clamp ring face
(2) Turn the wheel until one nut is at the top
outboard.
of the bolt circle, then tighten evenly and
alternatively according to a torque of 140
(2) Turn the wheel until one nut is at the top
ft-lbs (190 N-m).
of the bolt circle, then tighten evenly and
alternatively according to a torque of 140
g. Dual Wheel Installation
ft-lbs (190 N-m).
NOTE
(1) Place the inner and outer wheel and
Lateral runout should not exceed
clamp ring in position on the hub/rotor and
0.125 inch (3.18 mm) on the front
install the lug nuts, snugly, in a criss-cross
wheel and 0.187 inch (4.76 mm) on
pattern to minimize runout.
the rear wheels.
h. Inflate tire(s) to 30 psi (450 kPa).
i. Lower vehicle.
4-206. RIMS REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIALSETUP :
Tools
Jack
Lug Wrench
Tire Changing Machine
Wire Brush
General Safety Instructions
Engine OFF.
Materials/Parts
Transmission in (N) neutral.
Rubber Lubricant
Parking brake and micro-brakelock set.
Rims (1403538)
4-279
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |