|
|
TM 5-4210-224-14&P
4-65. TANK REPLACEMENT (Continued).
c. Connect tank to piping connection (1) with
f. Install fill tower bracket (paragraph 4-58).
gaskets (4), clamps (3), and screws (2).
g. Install pump panel (paragraph 439).
d. Install water tank level sender (paragraph 4-63).
h. Close drain and refill tank (paragraph 2-24).
e. Install hose bed floor (paragraph 4-59).
i. Reconnect battery cables.
4-102
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |