Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPAIR (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-34 3-8. ENGINE Continued (9) Using compressed air, blow dry the air and water sides of the core. (10)   Visually inspect the cooler core tubes and fins to ensure that the cleaning process has completely removed all contamination. Repeat the cleaning procedure and reinspect as necessary. (11)   Test  the  aftercooler  for  leaks.  Plug  one  core  opening  and  attach  a  compressed  air  source  to  the  other opening.   Submerge   the   aftercooler   in   clean   water   and   apply   30   psi   (207   kPa)   air   pressure.   Replace aftercooler if any leaks are found in the core element. (12)   Install the aftercooler as detailed in INSTALLATION preceding. 3-129

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business