Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-34 3-8. ENGINE - Continued (57)  Before performing start up, fill all air reservoirs with shop air.  Connect shop air to the connection on the right hand side of the pump body.  Charge all tanks to 100 psi.  Remove ground wire from fuel shutoff solenoid.    This  ensures  positive  fuel  shutoff.    Crank  engine  several  times  till  engine  oil  pressure  Is registered on instrument panel gage. (58)  Reconnect ground wire to shutoff solenoid. (59)  Recheck coolant level in radiator.  Add coolant (item 2, Appendix B) as required. (60)  Start engine.  Run for 5 minutes at idle.  Observe and listen to engine running.  Record areas for further inspection and repair. (61)  Conduct  a  recheck  of  all  systems.    Add  fluids  as  required  (Refer  to  step  56).    Correct  and  repair problems recorded during initial run period. (62)  Start engine and run for 30 minutes at 1500 rpm.  The engine should be observed at all times so that any malfunction which develops will be detected. (63)  Shutdown engine, repair any components and refit all other equipment to truck. 3-91

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business