Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACEMENT (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-34 2-15. WATER TANK ASSEMBLY - Continued 2-15.1    Water Tank - Continued (16)  Install water level sensor (11) (17)  Inspect old vibration isolators (13) and replace if required. Place washers (6) on top of vibration isolators. (18)  Attach lifting equipment to water tank and lift the tanks onto the truck frame. (19)  Aline mounting holes in tank brackets with holes in vibration isolators and washers (6) and install attaching hardware, items (3 thru 5, 7, and 8). (20)  Tighten nuts (3) until springs (5) are compressed to a length of 3.0 In.  (76 mm).  This will provide a spring pre- load of approximately 370 lbs. (21)  Install winterization hoses (1 and 2) and remove crimps. (22)  Connect tank fill valve control air line (14) to fitting on rear face of water tank. (23)  Install water tank fill hose (12). (24)  Attach outlet piping (15) to foam tank. 2-142

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business