Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-12 4-19.  WINTERIZATION SYSTEM - Continued (5) Refill radiator.  Ensure winterization valves are open on main engine. (6) Start APU only (not winterization heater) and leave running for at least 15 minutes.  Top up radiator as required during this time.  Check system for leaks.  Tighten/remake connections as required. (7) While APU is running, loosen connection on winterization heater outlet and bleed air from top of heater . Retighten hose clamp. (8) Stop APU and start main engine.  Run engine until normal operating temperature is reached. (9) Check system for leaks.  Tighten/remake connections as required. (10) Shut down engine and allow radiator to cool for 1 hour. (11) Check level of radiator.  Top up as required. 4-295

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business