| |
TM 5-4210-220-12
4-19 WINTERIZATION SYSTEM - Continued
INSTALLATION
(1)
All threads must be sealed with pipe sealant (item 22, Appendix E) prior to installation.
(2)
Install pump body inspection door.
(3)
Install top cover on fuel tank compartment.
4-291
|