Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PUMP BODY SWITCHES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-12 Table 4-1.  Unit PMCS - Continued W - Weekly M - Monthly S - Semi-Annually M - Monthly B - Bi-Annual ITEM ITEM TO BE INSPECTED/PROCEDURE NO. W M S A B 9 PUMP BODY SWITCHES: Perform operational test of all switches.  Inspect all switches for physical damage.  Check all electrical connections are tight. 10 PUMP BODY AIR COMPONENTS: Inspect all air lines and piping for evidence of leaks or cracks.  Replace individual fittings and hoses as necessary.  Perform operational test of all air switches. 11 VALVE LEVERS: Operate valve levers.  Check for smooth operation.  Check each lever locks with less than 1 full turn of knob.  Check valve is fully open when knob is set to full open and valve is fully closed when knob is set to full closed. 12 GAGES: Check that the bubble in each gage is less than 25% of the total area of the glass.  Replace gage as required.  Check all gages read similar pressures when subject to the same pump pressure.  Check all water lines to the gages for leaks.  Replace/tighten as required.  Refer to paragraph 4-13. 13 CAB AND PUMP BODY SAFETY BARS: Check all safety bars for tightness.  Replace as required.  Refer to paragraph 4-12 14 SUCTION AND DISCHARGE CONNECTIONS: Check all cap retaining chains are in place.  Remove each cap and check threads for severe damage.  Replace connection/cap as required.  Check all suction strainers are in place and are clean. 15 FLIP-UP STEP: Check both flip-up steps between pump body and hose body are securely hinged to hose body.  Be sure they clip safely to hose body in the up position.  Straighten/replace as required. 16 FIRE PUMP: Perform operational test from draft supply with 20 feet of hard suction hose.  Check pump primes in less than 30 seconds.  While pumping check for water or oil leaks through the hole in the bottom of housing between the pump volute body and gear housing. 4-10 Interval

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business