Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Disassembly.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P e. Remove pinion shaft (8) by driving on handle end and then pulling it out by opposite end. f. Ratchet gear assembly({1 1), friction disc (12) and pinion gear assembly(13) will drop free as  pinion  shaft  (8)  is removed. g. Remove bushings (14) and (15). NOTE Do  not  perform  the  next  step  unless  it  is  clearly  evident  that  some  part  of  the  pawl  assembly requires replacement. h. Remove locknut (16), ratchet bolt (17), ratchet spring (18), ratchet spacer (19) and ratchet pawl (20). 5-2.2.  Cleaning. a. Clean components of all visible grease, oil or dirt with cleaning solvent (Item 7, Section II, Appendix F. b. Maintain clean conditions during reassembly. 5-2.3.  Inspection. a. Measure friction disc (12) for wear.  If thickness is less than 1/16 inch replace friction disc and handle disc. b. Inspect all metallic parts for cracks, chips or signs of wear.  Replace winch assembly if any parts are cracked or chipped. 5-2.4.  Assembly. a. Coat ratchet pawl (20) with oil (item 8, Section II, Appendix F). b. Install ratchet bolt (17) through ratchet pawl (20), ratchet spacer (19), ratchet spring (18) and frame (21). c. Install locknut (16) on ratchet bolt (17). d. Coat pinion shaft (8) and two bushings (14) and (15) with oil (item 8, Sect II, Appx F). e. Insert pinion shaft (8) through bushing (15) and place pinion gear assembly (13), friction disc (12) and ratchet gear assembly (11) on pinion shaft as it is inserted. f. Seat pinion shaft (8) and install retaining ring (10). g. Install handle disc (9), handle (7), spring (6) and retaining ring (5). h. Install frame spacer (4) in drum (3) core. i. Install cap screw (2) through frame (21), drum (3) and frame. j. Install locknut (1) on cap screw (2). k. Operate assembly and listen for clicking sound to verify correct assembly. 5-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business