| |
TM 5-4210-218-13&P
SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
4-28. PREPARATION FOR STORAGE.
a.
Clean system components.
CAUTION
Do not invert scale assembly. Inversion will disconnect the column assembly indicator from the
base assembly.
b.
Using a fork lift, move the Recovery / Recharger Unit to the storage location. The storage location should be level
and well drained.
c.
Install cover
4-29. PREPARATION FOR SHIPMENT.
WARNING
Wear safety glasses or goggles while performing the following procedures.
a.
Securely attach the nitrogen pressure regulator to the shaker bracket with two U-bolts and four nuts and washers.
U-bolts stored in tool box.
b.
Using the hoist winch assembly, lift (para. 2-6.3) the Halon cylinder and nitrogen cylinder off the base assembly
and set aside for separate transport.
NOTE
The adjustable straps are stored in the tool box.
c.
Remove the scale assembly (para. 4-13.1). Secure the scale assembly to the top surface of the tool box using
two adjustable straps.
d.
Remove the hoist winch assembly (para. 4-8.1). Place the hoist winch assembly in a secure position across the
top of the unit.
e.
Install the equipment cover (para 4-27.2).
f.
Enclose the Recovery / Recharger Unit in the original shipping container. If not available consult transportation
authorities for the required packaging.
g.
Transport the shipping container using a fork lift.
4-43(4-44 BLANK)
|