TM 5-4210-218-13&P
4-26 SLING CONNECTING RING REPLACEMENT. (Refer to Figure 4-18)
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Equipment Condition
Tools
Reference
General Mechanics Tool Box, Item 1, Section
Cover removed from Recovery / Recharger
III, Appendix B.
paragraph 2-6.1
Materials/Parts
Air supply disconnected, paragraph 2-7
Self-locking nuts
Sling Connecting Ring
4-26.1 Removal.
a.
Refer to procedure 4-25.1 U-Bolt Replacement and perform steps a and b..
b.
Discard old sling connecting ring (4).
4-26.2 Installation.
a.
Check new sling connecting ring (4) for defects.
b.
Slip sling connecting ring (4) on U-bolt.
c.
Refer to procedure 4-25.2 U-Bolt Replacement and perform steps d and e.
4-40
|