| |
TM 5-4210-218-13&P
4-25 U-BOLT REPLACEMENT. (Refer to Figure 4-18)
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Equipment Condition
Tools
Reference
General Mechanics Tool Box, Item 1, Section
Cover removed from Recovery / Recharger
III, Appendix B.
paragraph 2-6.1
Materials/Parts
Air supply disconnected, paragraph 2-7
Self-locking nuts
U-bolt
4-25.1 Removal.
a.
Remove two nuts (1) and washers (2) holding U-bolt (3) to base and discard nuts.
b.
Remove U-bolt (3) and slip sling connecting ring (4) off U-bolt and retain ring for reuse.
c.
Remove two stop nuts (5) from U-bolt and discard nuts
4-25.2 Installation.
a.
Check new U-bolt (3) for defects.
b.
Install stop nuts (5) on U-bolt as far as threads will allow.
c.
Slip sling connecting ring (4) on U-bolt.
d.
Fit U-bolt and ring assembly through appropriate holes in base.
e.
Install two washers (2) and nuts (1) and tighten.
4-38
|