| |
TM 5-4210-218-13&P
4-17. TIEDOWN ASSEMBLY REPLACEMENT. (Refer to Figure 4-9)
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Equipment Condition
Tools
Reference
General Mechanics Tool Box, Item 1, Section
Cover removed from Recovery / Recharger
III, Appendix B.
paragraph 2-6.1
Materials/Parts
Air supply disconnected, paragraph 2-7
Self-locking nuts
As required
4-17.1 Removal.
a.
Remove nut (1), washer (2), and bolt (3). Retain for use.
b.
Remove chain (5) and snap and discard, but leave washer (4) on bolt (3).
4-17.2 Installation.
a.
Place bolt (3) with washer (4) through last link of new chain (5).
b.
Position bolt (3) through hole in base floor.
c.
Install washer (2) and nut (1) and tighten.
d.
Invert rack and hook into position to verify proper installation.
Figure 4-9. Tie Down Replacement
4-22
|