Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P 2-3   OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES PROCEDURES. a. The PMCS procedures contained in table 2-1 will help you find and fix defects before the Recovery / Recharger Unit is damaged or fails.  Each procedure is keyed to an illustration which shows the location and details of the component(s) being checked or serviced.  These item numbers are contained in  the  ITEM  NUMBER  column  of table 2-1. b. The  INTERVAL  column  of  table  2-1  indicates  the  service  interval  of  the  PMCS  procedure:    Before,  During  and After operation of the Recovery / Recharger Unit. c. The EQUIPMENT IS NOT READY/AVAILABLE IF column of table lists conditions which prevent operation of the Recovery / Recharger Unit.  These conditions must be corrected prior to operation of the Recovery / Recharger Unit. d. Leakage definitions used in the PMCS are classified as follows: (1) Leakage of Halon is not allowed. INITIAL SETUP Tools None identified Materials/Parts Personnel Required None identified 2 each 52C Utility Equipment Repairer 2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business