| |
TM 5-4210-218-13&P
2-3
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES PROCEDURES.
a.
The PMCS procedures contained in table 2-1 will help you find and fix defects before the Recovery / Recharger
Unit is damaged or fails. Each procedure is keyed to an illustration which shows the location and details of the
component(s) being checked or serviced. These item numbers are contained in the ITEM NUMBER column of
table 2-1.
b.
The INTERVAL column of table 2-1 indicates the service interval of the PMCS procedure: Before, During and
After operation of the Recovery / Recharger Unit.
c.
The EQUIPMENT IS NOT READY/AVAILABLE IF column of table lists conditions which prevent operation of the
Recovery / Recharger Unit. These conditions must be corrected prior to operation of the Recovery / Recharger
Unit.
d.
Leakage definitions used in the PMCS are classified as follows:
(1)
Leakage of Halon is not allowed.
INITIAL SETUP
Tools
None identified
Materials/Parts
Personnel Required
None identified
2 each 52C Utility Equipment Repairer
2-3
|