| |
TM 5-4210-218-13&P
5-11 SCALE ASSEMBLY REPAIR. (Refer to Figure 5-10)
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Equipment Condition
Tools
Reference
Tool Kit, General Mechanics
Scale removed from Recovery / Recharger
(Item 1, Section III Appendix B)
Unit; paragraph 4-13.1
Materials/Parts
As required
5-11.1
Dial Chart Cover Replacement.
5-11.1.1
Removal.
NOTE
Before beginning this procedure, be sure there is no load on platform and scale is zeroed.
a.
Remove three screws ( 1 ) from scroll ( 2 ).
b.
Gently pry scroll loose and remove both scroll and dial chart cover ( 3 ).
c.
Discard cover.
5-11.1.2
Installation.
a.
Inspect replacement cover visually for defects. Do not use if defective.
b.
Insert cover into scroll (2)
c.
Mount assembly to dial housing assembly being sure to align screw hole in scroll and housing assembly.
d.
Install and tighten three screws ( 1 ) to secure scroll to housing assembly.
5-11.2
Tare Device Assembly Replacement.
5-11.2.1
Removal.
NOTE
Before beginning this procedure, be sure there is no load on platform and scale is zeroed.
a.
Remove three screws (4) from dial housing back plate ( 5 ).
b.
Unscrew tare knob (6) and remove.
5-32
|