TM 5-4210-218-13&P
5-6. CONTROL PANEL ASSEMBLY REPLACEMENT. (Refer to Figure 5-5)
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Condition
Tools
Reference
General Mechanics Tool Box, Item 1, Section
Cover removed from Recovery / Recharger
III, Appendix B.
Unit; paragraph 2-6.1
Materials/Parts
Self-locking nuts
NOTE
Refer to paragraph 5-5 for instructions on Control panel component removal and installation.
5-6.1. Control Panel Removal.
a.
Following instructions in paragraph 5-5, release all gauges and valves from control panel. Hoses will have to be
disconnected from gauges but not valves.
NOTE
Exercise caution when removing last two screws. Control panel may swing and/or drop.
b.
When all gauges and valves have been freed from control panel, remove eight screws (1) and washers (2) holding
control panel (3) to frame.
c.
Set panel aside for disposal.
5-6.2. Control Panel Installation.
a.
Check replacement panel visually for defects. Do not use if defective.
b.
Position control panel (3) and install washer (2) and screw (1) through control panel (3) and into two upper
mounting holes. Do not tighten.
c.
Install remaining six washers (2) and screws (1) and tighten all eight.
d.
Following installation instructions in paragraph 5-5, reinstall and reconnect all gauges and valves.
5-6.3. Support Frame Removal.
NOTE
If support frame and panel are both to be replaced, follow procedures in paragraph 5-6.1 .a. If only
frame is to be removed, follow steps a and b.
5-15
|