(3)
Replace or repair damage or defective
parts as necessary.
c.
Installation. Refer to figure 3-48, and install the
drain valve and tubing on the valves, lines, and bracket.
3-94. Heat Exchanger, Tubing, Hoses, Clamps, and
Fittings Refer to figure 3-49, and remove and replace
defective heat exchanger, tubing, hoses, clamps, and
fittings.
3-95. Relief Valve Control
a.
Removal. Refer to figure 3-36, and remove the
relief valve control from the left side control panel.
b.
Cleaning, Inspections, and Repair.
(1)
Clean all parts with an approved cleaning
solvent, and dry thoroughly.
(2)
Inspect
for
damaged
or
defective
condition.
(3)
Replace or repair damaged or defective
parts as necessary.
c.
installation. Refer to figure 3-36, and install the
relief valve control on the left side control panel.
3-96. Water Pump Packing
Refer to figure 3-50, and adjust the fire pump packing.
Figure 3-40. Primer pump and universal joint, removal and installation.
3-57
|