Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-16. Ball Valve Settings for Clearing Hoses
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4210-235-13 CAUTION Hose  assembly  clean-out  must  take  place  Immediately  after  tank  has  been  completely  or partially discharged. (1) Completely  unwind  hose  assembly  from  drum.    If  auxiliary  mobile  hose  reel  cart  was  used,  both  hose assemblies must be unwound. (2) Close dry chemical and AFFF tank ball valve rods (1) (fig.  2-15). (3) Break strip ties (1) (fig.  2-16).  Remove retaining clips (2) and close charge ball valves (3) (4) Break strip ties (4).  Remove retaining clips (5) and open both purge ball valves (6) Figure 2-16.  Ball Valve Settings for Clearing Hoses 2-43

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business