TM 10-4210-235-13
(6)
Install AFFF tank. See paragraph 4-24
(7)
Install dry chemical tank See paragraph 4-22
(8)
Install lift bar See paragraph 4-21.
(9)
Install hose reel assembly. See paragraph 4-19
(10)
Install regulators See paragraph 4-16.
(11)
Install cylinders. See paragraph 4-11.
5-11/(5-12 blank)
|