Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4210-235-13 4-22.  DRY CHEMICAL TANK REPLACEMENT AND REPAIR - continued (14) Push loose cable (8) end through another new cable sleeve (52).  Push cable end back into cable sleeve to form  a  loop  Just  large  enough  to  fit  retaining  clip  (4)  through.    Secure  by  crimping  sleeve.    Repeat  for second cable (8) (15) Slip one retaining clip (4) into each cable (8) loop. (16) Install ball valve mounting bracket (7) onto ball valve (9) with two screws (5). (17) Install ball valve mounting bracket (6) onto ball valve (14) with two screws (5) (18)    Install  one  retaining  clip  (4)  over  ball  valve  (9)  handle  m  open  position  and  one  retaining  clip  over  ball valve  (14)  handle  m  closed  position.    Install  one  strip  tie  (3)  between  each  retaining  clip  and  valve mounting bracket (6) and (7). (19) Install fill cap (1) and hand tighten only. e.  Installation (See figure 4-19.  ) (1) Remove cap (8) and place tank lifting tool (9) onto tank (10) fill collar.  Install cap. WARNING Tank  can  swing  while  suspended  from  a  lifting  device  causing  injury  to  personnel and/or damage to equipment. CAUTION Piping is exposed extending outside of tank and can be damaged when lifting. (2) Attach lifting device to tank lifting tool (9).  Secure tank (10) from swinging and carefully lift.  Lower tank onto unit while aligning mounting holes. (3) Remove cap (8) and tank lifting tool (9).  Install cap and hand tighten only (4) Install four screws (6), flat washers (7), new lock washers (5), and nuts (4). (5) Attach rod (2) to valve (3).  Install new spring pin (1) Place valve m closed position. (6) Install cylinders per paragraph 4-11. (7) Install discharge and charging hose per paragraph 4-15, b (8) Install lift bar per paragraph 4-21 (9) Fill tank (8) with dry chemical per paragraph 2-10. 4-50

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business