Quantcast Boresight Retention Inspection

 

Click here to make tpub.com your Home Page

Page Title: Boresight Retention Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Mounting Telescope to Azimuth Test Fixture
Up
TM-9-1240-375-34-P Quadrant Fire Control: M17 (1290-01-037-3883) and M17A1 (1290-01-515-8260); Mount Telescope and Quadrant: M171 (1240-01-039-7273) Manual
Next
Boresight Retention Inspection - continued
TM 9-1240-375-34&P
0100 00
6
9
8
7
1 fc 6 5 4
4.
Turn azimuth knob (6) until 3200 mils appears on deflection counter (7).
5.
Release deflection counter eccentric (8).
6.
Turn azimuth knob (6) until 3200 mils appears on azimuth counter (9).
7.
Engage deflection counter eccentric (8).
11
6
12
10
1 fc 6 5 5
8.
Looking through eyeshield (10), turn elevation knob (11) until horizontal reticle line is centered on
collimator reticle target.
9.
Check that vertical reticle line is centered on collimator reticle target. If not centered, turn azimuth
counter to 3200 mils with backlash eliminated and release azimuth counter eccentric (12).
10.
Turn azimuth knob (6) until vertical reticle line is centered on collimator reticle target and engage
azimuth counter eccentric (12).
0100 00-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +