Quantcast Setting Up and Adjusting the Cross-Leveling Fixture - continued -820360418

 

Click here to make tpub.com your Home Page

Page Title: Setting Up and Adjusting the Cross-Leveling Fixture - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Setting Up and Adjusting the Cross-Leveling Fixture - continued -820360417
Up
TM-9-1240-375-34-P Quadrant Fire Control: M17 (1290-01-037-3883) and M17A1 (1290-01-515-8260); Mount Telescope and Quadrant: M171 (1240-01-039-7273) Manual
Next
Mounting the M171/M171A1 Mount on Cross-Leveling Fixture
TM 9-1240-375-34&P
0073 00
TEST AND INSPECTION - Continued
Setting Up and Adjusting the Cross-Leveling Fixture - Continued
1
30
34
36
29
1 fc 4 2 7
33.
Return cross-leveling fixture (1) to zero elevation and securely tighten inspection aid support assembly
(29) to elevation shaft (30).
34.
Turn knob (36) on inspection aid support assembly (29) to either limit stop; back off approximately 7-
3/4 turns. Level bubble (34) of inspection aid support assembly should be in approximate center of
level vial.
35.
Ensure all mounting surfaces are level and adjusted correctly by visually inspecting mount mating
surfaces.
Visual Inspection
1.
Check that all screws and lockwashers are present and tight.
2.
Check that lock wire is secure.
2
4
1
3
1 fc 4 2 8
0073 00-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +